Molly Redman photos of 1953 seawall rebuilding.

The following photos show various stages of the building of the ‘new’ seawall between 1953 and Christmas 1955. Only a couple of the photos have something written on the reverse.

Pile in place interlocked to preceding one.
Sheet piling wall in front of emergency sandbags.

Comments about this page

  • My dad helped to build the sea wall in 53, he was living Leigh Beck in a rented caravan with my mum and brother was born 53

    By Denise Stiles (03/07/2022)

Add a comment about this page

Your email address will not be published.